Aquasector LLC

15.11.2024

Installed ASX Wild-Lift H ("heavy lift") for the company Aquasector. It specializes in the manufacture of stainless steel swimming pools for private homes, so the storage system will be used to store stainless steel sheets. Installation of the system took only 6 days.

6 days

Implementation period

1

Heavy lift

Process

In 6 days, all elevator parts were connected and fixed, as well as electrical equipment was installed, fencing was installed, metal storage pallets were loaded

work on the project: from idea to implementation

Delving into the essence of the project

We design our products ourselves — therefore, you will not find analogues of some models. And in some cases we can change an existing product for a specific request.

We produce

All production operations — from cutting iron to packaging — take place in our workshops on modern equipment. We follow the latest developments in the machine tool industry and put them into operation.

We deliver, assemble and give a guarantee

We are responsible for our products, including after-sales, offering warranty and post-warranty service, as well as delivery and assembly.

If you are interested in DiKom products, just leave your contact details

We will contact you, answer all questions, and help create a project for you